Concrete estimating software
Price the pour, not just the yardage
A concrete bid is more than cubic yards: forms, base, vapor barrier, reinforcement, finish, joints, demo, pump time. BuiltSum’s assemblies carry the yardage math and waste per unit so a driveway or a slab package prices in minutes — and on commercial work the winning number becomes your schedule of values and monthly pay applications. The estimator below is live.
Try it now — concrete pack loaded, free
Flatwork to footings
4" and 6" slabs, trowel and broom finishes, gravel base, vapor barrier, footings, stem walls, curbs, steps — each with labor and material per unit.
Reinforcement & add-ons explicit
Mesh, #4 grid, fiber, joints, cure & seal, pump-truck add-on per yard — visible lines the customer and the GC can both read.
Commercial pours bill monthly
SOV from the estimate, percent complete per line, retainage tracked to release — AIA-style pay apps on every plan.
On commercial contracts, check your withholding against the 50-state retainage table and bill with the free pay application generator.
What is in the concrete pack
17 assemblies ship in pack 2026.08. Every material cost and labor rate below is a starting default for a mid-market, non-union crew — edit any of them, and your own won jobs become the defaults over time.
Flatwork
- 4" slab on grade — form, place, broom finishSF
- 6" slab on grade — form, place, broom finishSF
- Smooth trowel finish add-on (interior)SF
- 4" compacted gravel baseSF
- Vapor barrier 10–15 milSF
Reinforcement
- Welded wire meshSF
- #4 rebar grid @ 18" oc, tiedSF
- Fiber reinforcement add-on (per CY in mix)CY
Footings & walls
- Footing 16" × 8" — form, rebar (2×#4), placeLF
- Stem wall 8" × 24" — form both sides, place, stripLF
- Curb/gutter sectionLF
- Steps — formed, per riser LFLF
Demo & prep
- Demo existing 4" slab + haul-offSF
- Fine grade & excavate to 8" depthSF
Placement add-ons
- Pump truck add-onCY
- Expansion/control joints — saw cut or tooledLF
- Cure & seal applicationSF
Frequently asked questions
How do you estimate a concrete job?
Quantify by placement: slab square footage (thickness sets the yardage — a 4-inch slab runs about 81 SF per cubic yard before waste), footings and curbs by the linear foot, then reinforcement, base, vapor barrier, and finish as their own lines. Price material at your plant's per-yard rate with ~10% waste, labor by crew production rate, then burden and markup. The assemblies here follow that structure with the yardage math pre-baked per unit.
Why price demo, base, and pump as separate lines?
Because they vary job to job and are the first things a customer asks to cut. Separate lines keep your slab price competitive while making tear-out, gravel base, and pump-truck days visible and negotiable — and on commercial work, separate lines mean observable percent-complete when you bill.
Does it handle waste factors and over-excavation?
Waste is baked into each assembly's material cost (noted per assembly, ~10% on placed concrete) and every value is editable — if your subgrade runs rough and you pour 4.5 inches on average, set your own number. Your history becomes your price book; the defaults are just the starting point.
What about billing commercial concrete work?
Flatwork packages on commercial jobs are progress-billed with retainage. In BuiltSum the accepted estimate becomes the schedule of values, and monthly AIA-style G702/G703-style pay applications — with per-line retainage and stored materials — are included on every plan.